Cost Breakdown
Name/Model: Ajax AJX-1A
Technology: Inner Sphere
Tonnage: 90
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (268 pts) 15.0 x 20,000 300,000.00
Internal Structure (Standard) 9.0 x 10,000 (+) 90,000.00 = 390,000.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 435,000.00
Engine (Fusion) (5,000 x 270 x 90) / 75 (+) 1,620,000.00 = 2,055,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 2,062,500.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,062,500.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 200,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 200,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 280,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 360,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 560,000.00
Heavy Gauss Rifle 500,000 (+) 500,000.00 = 1,060,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,060,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,060,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,060,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,060,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,065,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,070,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,075,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 1,075,000.00
Streak SRM 4 90,000 (+) 90,000.00 = 1,165,000.00
Streak SRM 6 120,000 (+) 120,000.00 = 1,285,000.00
Streak SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 1,285,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,285,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 2,062,500.00
Weapons and Equipment Cost (+) 1,285,000.00 = 3,347,500.00
Combat Vehicle Cost Multiplier 1 + (90 / 100) (*) 1.9 = 6,360,250.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,360,250.00
|