Cost Breakdown
Name/Model: Hetzer Wheeled Assault Gun (SD) "Safety Dance"
Technology: Inner Sphere
Tonnage: 40
Configuration: Wheeled Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (119 pts) 6.0 x 25,000 150,000.00
Internal Structure (Standard) 4.0 x 10,000 (+) 40,000.00 = 190,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 210,000.00
Engine (Fuel Cell) (3,500 x 180 x 40) / 75 (+) 336,000.00 = 546,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 548,000.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost 548,000.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
CASE 50,000 (+) 50,000.00 = 300,000.00
Combat Vehicle Escape Pod 10,000 (+) 10,000.00 = 310,000.00
MRM 40 350,000 (+) 350,000.00 = 660,000.00
MRM 40 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 660,000.00
MRM 40 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 660,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 660,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 548,000.00
Weapons and Equipment Cost (+) 660,000.00 = 1,208,000.00
Combat Vehicle Cost Multiplier 1 + (40 / 200) (*) 1.2 = 1,449,600.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,449,600.00
|