Cost Breakdown
Name/Model: Fortune Wheeled Assault (SD) "Safety Dance"
Technology: Inner Sphere
Tonnage: 80
Configuration: Wheeled Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (224 pts) 12.5 x 20,000 250,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 330,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 370,000.00
Engine (Fuel Cell) (3,500 x 220 x 80) / 75 (+) 821,333.33 = 1,191,333.33
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,193,333.33
Turret 3 x 5,000 (+) 15,000.00 = 1,208,333.33
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,208,333.33
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
C3 Computer (Master) 1,500,000 1,500,000.00
CASE 50,000 (+) 50,000.00 = 1,550,000.00
Combat Vehicle Escape Pod 10,000 (+) 10,000.00 = 1,560,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,960,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,960,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,960,000.00
Thunderbolt 20 450,000 (+) 450,000.00 = 2,410,000.00
Thunderbolt 20 (Ammo 3) [Empty Bin] 0 (+) 0.00 = 2,410,000.00
Thunderbolt 20 (Ammo 3) [Empty Bin] 0 (+) 0.00 = 2,410,000.00
Thunderbolt 20 (Ammo 3) [Empty Bin] 0 (+) 0.00 = 2,410,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,410,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 1,208,333.33
Weapons and Equipment Cost (+) 2,410,000.00 = 3,618,333.33
Combat Vehicle Cost Multiplier 1 + (80 / 200) (*) 1.4 = 5,065,666.67
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 5,065,667.00
|