Cost Breakdown
Name/Model: Swift Wind Technical
Technology: Inner Sphere
Tonnage: 8
Configuration: Wheeled Combat Vehicle
======================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------
Armor (Standard) (32 pts) 2.0 x 10,000 20,000.00
Internal Structure (Standard) 1.0 x 10,000 (+) 10,000.00 = 30,000.00
Control Components 0.5 x 10,000 (+) 5,000.00 = 35,000.00
Engine (Fusion) (5,000 x 60 x 8) / 75 (+) 32,000.00 = 67,000.00
Turret 0.5 x 5,000 (+) 2,500.00 = 69,500.00
------------------------------------------------------------------------------------------------------
Total Structural Cost 69,500.00
======================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------
Machine Gun 5,000 5,000.00
Machine Gun 5,000 (+) 5,000.00 = 10,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 10,000.00
------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 10,000.00
======================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------
Structural Cost 69,500.00
Weapons and Equipment Cost (+) 10,000.00 = 79,500.00
Combat Vehicle Cost Multiplier 1 + (8 / 200) (*) 1.04 = 82,680.00
------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 82,680.00
|