Cost Breakdown
Name/Model: Senshi (CEV)
Technology: Inner Sphere
Tonnage: 30
Configuration: Wheeled Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Standard) (24 pts) 1.5 x 10,000 15,000.00
Internal Structure (Standard) 3.0 x 10,000 (+) 30,000.00 = 45,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 60,000.00
Engine (Internal Combustion) (1,250 x 100 x 30) / 75 (+) 50,000.00 = 110,000.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost 110,000.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
Backhoe 50,000 50,000.00
Bridgelayer, Medium 75,000 (+) 75,000.00 = 125,000.00
Bulldozer 50,000 (+) 50,000.00 = 175,000.00
Lift Hoist 50,000 (+) 50,000.00 = 225,000.00
Lift Hoist 50,000 (+) 50,000.00 = 275,000.00
Minesweeper 40,000 (+) 40,000.00 = 315,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 315,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 110,000.00
Weapons and Equipment Cost (+) 315,000.00 = 425,000.00
Combat Vehicle Cost Multiplier 1 + (30 / 200) (*) 1.15 = 488,750.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 488,750.00
|