Cost Breakdown
Name/Model: Alacorn Heavy Tank (SD) "Safety Dance"
Technology: Inner Sphere
Tonnage: 95
Configuration: Tracked Combat Vehicle
=============================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (218 pts) 11.0 x 25,000 275,000.00
Internal Structure (Standard) 9.5 x 10,000 (+) 95,000.00 = 370,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 420,000.00
Engine (Fuel Cell) (3,500 x 285 x 95) / 75 (+) 1,263,500.00 = 1,683,500.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,685,500.00
Turret 4 x 5,000 (+) 20,000.00 = 1,705,500.00
-------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,705,500.00
=============================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
CASE 50,000 (+) 50,000.00 = 300,000.00
Chaff Pod 2,000 (+) 2,000.00 = 302,000.00
Combat Vehicle Escape Pod 10,000 (+) 10,000.00 = 312,000.00
Light Gauss Rifle 275,000 (+) 275,000.00 = 587,000.00
Light Gauss Rifle 275,000 (+) 275,000.00 = 862,000.00
Light Gauss Rifle 275,000 (+) 275,000.00 = 1,137,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 1,137,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 1,137,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 1,137,000.00
-------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,137,000.00
=============================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------
Structural Cost 1,705,500.00
Weapons and Equipment Cost (+) 1,137,000.00 = 2,842,500.00
Combat Vehicle Cost Multiplier 1 + (95 / 100) (*) 1.95 = 5,542,875.00
-------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 5,542,875.00
|