Cost Breakdown
Name/Model: Goblin SLRM
Technology: Inner Sphere (Mixed)
Tonnage: 45
Configuration: Tracked Combat Vehicle
==============================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (107 pts) 6.0 x 20,000 120,000.00
Internal Structure (Standard) 4.5 x 10,000 (+) 45,000.00 = 165,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 190,000.00
Engine (Internal Combustion) (1,250 x 180 x 45) / 75 (+) 135,000.00 = 325,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 332,500.00
--------------------------------------------------------------------------------------------------------------
Total Structural Cost 332,500.00
==============================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------
AP Gauss Rifle (C) 10,000 10,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] (C) 0 (+) 0.00 = 10,000.00
Streak LRM 5 (C) 75,000 (+) 75,000.00 = 85,000.00
Streak LRM 5 (C) 75,000 (+) 75,000.00 = 160,000.00
Streak LRM 5 (C) 75,000 (+) 75,000.00 = 235,000.00
Streak LRM 5 (C) 75,000 (+) 75,000.00 = 310,000.00
Streak LRM 5 (C) 75,000 (+) 75,000.00 = 385,000.00
Streak LRM 5 (C) 75,000 (+) 75,000.00 = 460,000.00
Streak LRM 5 (Ammo 24) [Empty Bin] (C) 0 (+) 0.00 = 460,000.00
Streak LRM 5 (Ammo 24) [Empty Bin] (C) 0 (+) 0.00 = 460,000.00
Streak LRM 5 (Ammo 24) [Empty Bin] (C) 0 (+) 0.00 = 460,000.00
--------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 460,000.00
==============================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------
Structural Cost 332,500.00
Weapons and Equipment Cost (+) 460,000.00 = 792,500.00
Combat Vehicle Cost Multiplier 1 + (45 / 100) (*) 1.45 = 1,149,125.00
--------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,149,125.00
|