Cost Breakdown
Name/Model: Babylon Supertank BLN-O C
Technology: Inner Sphere
Tonnage: 100
Configuration: Tracked OmniVehicle
==================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------
Armor (Light Ferro-Fibrous) (390 pts) 23.0 x 15,000 345,000.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 445,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 495,000.00
Engine (XL) (20,000 x 200 x 100) / 75 (+) 5,333,333.33 = 5,828,333.33
Heat Sinks (Single) 14 x 2,000 (+) 28,000.00 = 5,856,333.33
Turret 3.5 x 5,000 (+) 17,500.00 = 5,873,833.33
------------------------------------------------------------------------------------------------------------------
Total Structural Cost 5,873,833.33
==================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Enhanced LRM 20 312,500 (+) 312,500.00 = 362,500.00
Enhanced LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 362,500.00
Enhanced LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 362,500.00
LB 10-X AC 400,000 (+) 400,000.00 = 762,500.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 762,500.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 762,500.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 762,500.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 762,500.00
Medium X-Pulse Laser 110,000 (+) 110,000.00 = 872,500.00
Medium X-Pulse Laser 110,000 (+) 110,000.00 = 982,500.00
Medium X-Pulse Laser 110,000 (+) 110,000.00 = 1,092,500.00
Medium X-Pulse Laser 110,000 (+) 110,000.00 = 1,202,500.00
------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,202,500.00
==================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------
Structural Cost 5,873,833.33
Weapons and Equipment Cost (+) 1,202,500.00 = 7,076,333.33
Omni Conversion Cost 7,076,333.33 x 0.25 (+) 1,769,083.33 = 8,845,416.67
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 17,690,833.33
------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 17,690,833.00
|