Cost Breakdown
Name/Model: Bandit (Arrow)
Technology: Inner Sphere (Mixed)
Tonnage: 50
Configuration: Hover Combat Vehicle
=======================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (119 pts) 6.0 x 25,000 150,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 200,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 225,000.00
Lift/Dive Equipment 5 x 20,000 (+) 100,000.00 = 325,000.00
Engine (Fuel Cell) (3,500 x 165 x 50) / 75 (+) 385,000.00 = 710,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 712,000.00
Turret 0.5 x 5,000 (+) 2,500.00 = 714,500.00
-----------------------------------------------------------------------------------------------------------------------
Total Structural Cost 714,500.00
=======================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------------
AP Gauss Rifle (C) 10,000 10,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 20,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] (C) 0 (+) 0.00 = 20,000.00
Arrow IV System (C) 450,000 (+) 450,000.00 = 470,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] (C) 0 (+) 0.00 = 470,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] (C) 0 (+) 0.00 = 470,000.00
CASE (C) 2 x 50,000 (+) 100,000.00 = 570,000.00
Compartment, Infantry (5 ton) 10 x 0 (+) 0.00 = 570,000.00
-----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 570,000.00
=======================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------------
Structural Cost 714,500.00
Weapons and Equipment Cost (+) 570,000.00 = 1,284,500.00
Combat Vehicle Cost Multiplier 1 + (50 / 50) (*) 2 = 2,569,000.00
-----------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,569,000.00
|