Cost Breakdown
Name/Model: C - Zhukov (Dragoon)
Technology: Inner Sphere (Mixed)
Tonnage: 75
Configuration: Tracked Combat Vehicle
====================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (208 pts) 10.5 x 25,000 262,500.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 337,500.00
Control Components 4 x 10,000 (+) 40,000.00 = 377,500.00
Engine (Fuel Cell) (3,500 x 300 x 75) / 75 (+) 1,050,000.00 = 1,427,500.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,429,500.00
Turret 2 x 5,000 (+) 10,000.00 = 1,439,500.00
--------------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,439,500.00
====================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------
CASE (C) 1 x 50,000 50,000.00
LB 10-X AC (C) 400,000 (+) 400,000.00 = 450,000.00
LB 10-X AC (C) 400,000 (+) 400,000.00 = 850,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 850,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 850,000.00
LB 10-X AC (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 850,000.00
LB 10-X AC (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 850,000.00
Streak SRM 6 (C) 120,000 (+) 120,000.00 = 970,000.00
Streak SRM 6 (Ammo 15) [Empty Bin] (C) 0 (+) 0.00 = 970,000.00
--------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 970,000.00
====================================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------------
Structural Cost 1,439,500.00
Weapons and Equipment Cost (+) 970,000.00 = 2,409,500.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 4,216,625.00
--------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 4,216,625.00
|