Cost Breakdown
Name/Model: Partisan II Egg
Technology: Inner Sphere
Tonnage: 80
Configuration: Wheeled OmniVehicle
====================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------
Armor (Reactive) (160 pts) 10.0 x 30,000 300,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 380,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 420,000.00
Engine (Fusion) (5,000 x 140 x 80) / 75 (+) 746,666.67 = 1,166,666.67
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 1,176,666.67
Turret 3.5 x 5,000 (+) 17,500.00 = 1,194,166.67
--------------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,194,166.67
====================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------
C3 Computer (Master) 1,500,000 1,500,000.00
ER PPC 300,000 (+) 300,000.00 = 1,800,000.00
Light Gauss Rifle 275,000 (+) 275,000.00 = 2,075,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 2,075,000.00
Silver Bullet Gauss Rifle 350,000 (+) 350,000.00 = 2,425,000.00
Silver Bullet Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 2,425,000.00
Silver Bullet Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 2,425,000.00
--------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,425,000.00
====================================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------------
Structural Cost 1,194,166.67
Weapons and Equipment Cost (+) 2,425,000.00 = 3,619,166.67
Omni Conversion Cost 3,619,166.67 x 0.25 (+) 904,791.67 = 4,523,958.33
Combat Vehicle Cost Multiplier 1 + (80 / 200) (*) 1.4 = 6,333,541.67
--------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,333,542.00
|