Cost Breakdown
Name/Model: Equalizer EQL-6C3M
Technology: Inner Sphere (Mixed)
Tonnage: 70
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (188 pts) 10.5 x 20,000 210,000.00
Internal Structure (Standard) 7.0 x 10,000 (+) 70,000.00 = 280,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 315,000.00
Engine (XL) (20,000 x 280 x 70) / 75 (+) 5,226,666.67 = 5,541,666.67
Turret 2 x 5,000 (+) 10,000.00 = 5,551,666.67
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 5,551,666.67
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
ATM 6 (C) 125,000 125,000.00
ATM 6 (C) 125,000 (+) 125,000.00 = 250,000.00
ATM 6 (Ammo 10) [ER] [Empty Bin] (C) 0 (+) 0.00 = 250,000.00
ATM 6 (Ammo 10) [ER] [Empty Bin] (C) 0 (+) 0.00 = 250,000.00
ATM 6 (Ammo 10) [ER] [Empty Bin] (C) 0 (+) 0.00 = 250,000.00
ATM 6 (Ammo 10) [ER] [Empty Bin] (C) 0 (+) 0.00 = 250,000.00
ATM 6 (Ammo 10) [HE] [Empty Bin] (C) 0 (+) 0.00 = 250,000.00
ATM 6 (Ammo 10) [HE] [Empty Bin] (C) 0 (+) 0.00 = 250,000.00
C3 Computer (Master) 1,500,000 (+) 1,500,000.00 = 1,750,000.00
CASE 50,000 (+) 50,000.00 = 1,800,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 2,000,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 2,150,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 2,300,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 2,300,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 2,300,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 2,316,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,316,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 5,551,666.67
Weapons and Equipment Cost (+) 2,316,000.00 = 7,867,666.67
Combat Vehicle Cost Multiplier 1 + (70 / 100) (*) 1.7 = 13,375,033.33
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 13,375,033.00
|