Cost Breakdown
Name/Model: Old Steed
Technology: Clan
Tonnage: 50
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (211 pts) 11.0 x 20,000 220,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 270,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 295,000.00
Engine (Internal Combustion) (1,250 x 150 x 50) / 75 (+) 125,000.00 = 420,000.00
Turret 1 x 5,000 (+) 5,000.00 = 425,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 425,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
CASE 1 x 50,000 50,000.00
ECM Suite 200,000 (+) 200,000.00 = 250,000.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 257,500.00
Heavy Machine Gun (Ammo 50) [Empty Bin] 0 (+) 0.00 = 257,500.00
Large Chemical Laser 75,000 (+) 75,000.00 = 332,500.00
Large Chemical Laser (Ammo 10) [Empty Bin] 0 (+) 0.00 = 332,500.00
LB 2-X AC 150,000 (+) 150,000.00 = 482,500.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 482,500.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 482,500.00
LRM 5 30,000 (+) 30,000.00 = 512,500.00
LRM 5 (Ammo 24) [Empty Bin] 0 (+) 0.00 = 512,500.00
Small Chemical Laser 10,000 (+) 10,000.00 = 522,500.00
Small Chemical Laser 10,000 (+) 10,000.00 = 532,500.00
Small Chemical Laser (Ammo 60) [Empty Bin] 0 (+) 0.00 = 532,500.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 532,500.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 425,000.00
Weapons and Equipment Cost (+) 532,500.00 = 957,500.00
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 1,436,250.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,436,250.00
|