Cost Breakdown
Name/Model: Black Stallion Heavy Assault Tank
Technology: Clan
Tonnage: 80
Configuration: Wheeled Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (320 pts) 20.0 x 10,000 200,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 280,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 320,000.00
Engine (XL) (20,000 x 220 x 80) / 75 (+) 4,693,333.33 = 5,013,333.33
Turret 3 x 5,000 (+) 15,000.00 = 5,028,333.33
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 5,028,333.33
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
CASE 1 x 50,000 50,000.00
ECM Suite 200,000 (+) 200,000.00 = 250,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 330,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 410,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 560,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 710,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 710,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 710,000.00
Light Active Probe 150,000 (+) 150,000.00 = 860,000.00
Ultra AC/10 320,000 (+) 320,000.00 = 1,180,000.00
Ultra AC/10 320,000 (+) 320,000.00 = 1,500,000.00
Ultra AC/10 (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,500,000.00
Ultra AC/10 (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,500,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,500,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 5,028,333.33
Weapons and Equipment Cost (+) 1,500,000.00 = 6,528,333.33
Combat Vehicle Cost Multiplier 1 + (80 / 200) (*) 1.4 = 9,139,666.67
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 9,139,667.00
|