Cost Breakdown
Name/Model: Von Luckner Heavy Tank VNL-Dragon 3093
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (143 pts) 8.0 x 20,000 160,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 235,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 275,000.00
Engine (XL) (20,000 x 225 x 75) / 75 (+) 4,500,000.00 = 4,775,000.00
Turret 2.5 x 5,000 (+) 12,500.00 = 4,787,500.00
--------------------------------------------------------------------------------------------------------
Total Structural Cost 4,787,500.00
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
Armored Motive System 11.5 x 100,000 1,150,000.00
C3 Computer (Master) 1,500,000 (+) 1,500,000.00 = 2,650,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 2,950,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 2,950,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 2,950,000.00
MRM 10 (Ammo 24) [Empty Bin] 0 (+) 0.00 = 2,950,000.00
MRM 10 w/ Apollo FCS 50,000 + 125,000 (+) 175,000.00 = 3,125,000.00
SRM 4 60,000 (+) 60,000.00 = 3,185,000.00
SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 3,185,000.00
Targeting Computer 4 x 10,000 (+) 40,000.00 = 3,225,000.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 3,225,000.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
Structural Cost 4,787,500.00
Weapons and Equipment Cost (+) 3,225,000.00 = 8,012,500.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 14,021,875.00
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 14,021,875.00
|