|                  Cost Breakdown
Name/Model:         Worker Crab MOD
Technology:         Inner Sphere
Tonnage:            50
Configuration:      Biped IndustrialMech
=========================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------
  Armor (Heavy Industrial):            (112 pts) 7.0 x 10,000                               70,000.00                    
  Internal Structure (Industrial):     50 x 300 x 1                             (+)         15,000.00  =        85,000.00
  Myomer (Industrial Triple-Strength): 50 x 12,000                              (+)        600,000.00  =       685,000.00
  Engine (Fuel Cell):                  (3,500 x 200 x 50) / 75                  (+)        466,666.67  =     1,151,666.67
  Gyro (Standard):                     2.0 x 300,000                            (+)        600,000.00  =     1,751,666.67
  Cockpit (Industrial w/ Adv. FCS):    200,000                                  (+)        200,000.00  =     1,951,666.67
  Life Support:                        50,000                                   (+)         50,000.00  =     2,001,666.67
  Sensors:                             50 x 2,000                               (+)        100,000.00  =     2,101,666.67
  Heat Sinks (Single):                 6 x 2,000                                (+)         12,000.00  =     2,113,666.67
  Arm Actuators:                       50 x ((100 x 2) + (50 x 2) + (80 x 2))   (+)         23,000.00  =     2,136,666.67
  Leg Actuators:                       50 x ((150 x 2) + (80 x 2) + (120 x 2))  (+)         35,000.00  =     2,171,666.67
-------------------------------------------------------------------------------------------------------------------------
Total Structural Cost:                                                                                       2,171,666.67
=========================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------
  Power Amplifier                      0.5 x 20,000                                         10,000.00                    
  Small Laser                          11,250                                   (+)         11,250.00  =        21,250.00
  Small Laser                          11,250                                   (+)         11,250.00  =        32,500.00
  Small Laser                          11,250                                   (+)         11,250.00  =        43,750.00
  Small Laser                          11,250                                   (+)         11,250.00  =        55,000.00
  SRM 6                                80,000                                   (+)         80,000.00  =       135,000.00
  SRM 6 (Ammo 15) [Empty Bin]          0                                        (+)              0.00  =       135,000.00
  SRM 6 (Ammo 15) [Empty Bin]          0                                        (+)              0.00  =       135,000.00
  Tracks                               (500 x 200 x 50) / 75                    (+)         66,666.67  =       201,666.67
-------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                               201,666.67
=========================================================================================================================
IndustrialMech Cost
-------------------------------------------------------------------------------------------------------------------------
  Structural Cost:                                                                       2,171,666.67                    
  Weapons and Equipment Cost:                                                   (+)        201,666.67  =     2,373,333.33
  IndustrialMech Cost Multiplier:      1 + (50 / 400)                           (*)              1.13  =     2,670,000.00
-------------------------------------------------------------------------------------------------------------------------
Final IndustrialMech Cost                                                                                    2,670,000.00
 |