Cost Breakdown
Name/Model:         Burke 1S
Technology:         Inner Sphere
Tonnage:            75
Configuration:      Tracked Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
  Armor (Standard)                   (136 pts) 8.5 x 10,000               85,000.00                    
  Internal Structure (Standard)      7.5 x 10,000             (+)         75,000.00  =       160,000.00
  Control Components                 4 x 10,000               (+)         40,000.00  =       200,000.00
  Engine (Fusion)                    (5,000 x 150 x 75) / 75  (+)        750,000.00  =       950,000.00
  Heat Sinks (Single)                20 x 2,000               (+)         40,000.00  =       990,000.00
  Turret                             2.5 x 5,000              (+)         12,500.00  =     1,002,500.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                      1,002,500.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
  LRM 5                              30,000                               30,000.00                    
  LRM 5 (Ammo 24) [Empty Bin]        0                        (+)              0.00  =        30,000.00
  PPC                                200,000                  (+)        200,000.00  =       230,000.00
  PPC                                200,000                  (+)        200,000.00  =       430,000.00
  PPC                                200,000                  (+)        200,000.00  =       630,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                             630,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
  Structural Cost                                                      1,002,500.00                    
  Weapons and Equipment Cost                                  (+)        630,000.00  =     1,632,500.00
  Combat Vehicle Cost Multiplier     1 + (75 / 100)           (*)              1.75  =     2,856,875.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                  2,856,875.00
 
		 |