Cost Breakdown
Name/Model: Dragoon AEM-01
Technology: Inner Sphere
Tonnage: 70
Configuration: Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (206 pts) 11.5 x 20,000 230,000.00
Internal Structure (Standard): 70 x 400 x 1 (+) 28,000.00 = 258,000.00
Myomer (Standard): 70 x 2,000 (+) 140,000.00 = 398,000.00
Engine (XL): (20,000 x 280 x 70) / 75 (+) 5,226,666.67 = 5,624,666.67
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 6,524,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 6,724,666.67
Life Support: 50,000 (+) 50,000.00 = 6,774,666.67
Sensors: 70 x 2,000 (+) 140,000.00 = 6,914,666.67
Heat Sinks (Double): 11 x 6,000 (+) 66,000.00 = 6,980,666.67
Arm Actuators: 70 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 14,000.00 = 6,994,666.67
Leg Actuators: 70 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 49,000.00 = 7,043,666.67
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 7,043,666.67
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
ER PPC 300,000 300,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 500,000.00
Jump Jets 70 x (3 x 3) x 200 (+) 126,000.00 = 626,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,026,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,426,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,426,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,426,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,426,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,426,000.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 7,043,666.67
Weapons and Equipment Cost: (+) 1,426,000.00 = 8,469,666.67
BattleMech Cost Multiplier: 1 + (70 / 100) (*) 1.70 = 14,398,433.33
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 14,398,433.00
|