Cost Breakdown
Name/Model:         Fortune Wheeled Assault Vehicle
Technology:         Inner Sphere
Tonnage:            80
Configuration:      Wheeled Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
  Armor (Standard)                           (224 pts) 14.0 x 10,000             140,000.00                    
  Internal Structure (Standard)              8.0 x 10,000             (+)         80,000.00  =       220,000.00
  Control Components                         4 x 10,000               (+)         40,000.00  =       260,000.00
  Engine (Fusion)                            (5,000 x 220 x 80) / 75  (+)      1,173,333.33  =     1,433,333.33
  Turret                                     3 x 5,000                (+)         15,000.00  =     1,448,333.33
---------------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                              1,448,333.33
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
  LB 20-X AC                                 600,000                             600,000.00                    
  LB 20-X AC                                 600,000                  (+)        600,000.00  =     1,200,000.00
  LB 20-X AC (Ammo 5) [Cluster] [Empty Bin]  0                        (+)              0.00  =     1,200,000.00
  LB 20-X AC (Ammo 5) [Cluster] [Empty Bin]  0                        (+)              0.00  =     1,200,000.00
  LB 20-X AC (Ammo 5) [Cluster] [Empty Bin]  0                        (+)              0.00  =     1,200,000.00
  LB 20-X AC (Ammo 5) [Cluster] [Empty Bin]  0                        (+)              0.00  =     1,200,000.00
  LB 20-X AC (Ammo 5) [Empty Bin]            0                        (+)              0.00  =     1,200,000.00
  LB 20-X AC (Ammo 5) [Empty Bin]            0                        (+)              0.00  =     1,200,000.00
  LB 20-X AC (Ammo 5) [Empty Bin]            0                        (+)              0.00  =     1,200,000.00
  LB 20-X AC (Ammo 5) [Empty Bin]            0                        (+)              0.00  =     1,200,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                   1,200,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
  Structural Cost                                                              1,448,333.33                    
  Weapons and Equipment Cost                                          (+)      1,200,000.00  =     2,648,333.33
  Combat Vehicle Cost Multiplier             1 + (80 / 200)           (*)               1.4  =     3,707,666.67
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                          3,707,667.00
 
		 |