Cost Breakdown
Name/Model: Po Artillery Tank
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
====================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (188 pts) 9.5 x 25,000 237,500.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 297,500.00
Control Components 3 x 10,000 (+) 30,000.00 = 327,500.00
Engine (Fuel Cell) (3,500 x 240 x 60) / 75 (+) 672,000.00 = 999,500.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,001,500.00
Turret 2 x 5,000 (+) 10,000.00 = 1,011,500.00
--------------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,011,500.00
====================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Long Tom Artillery Cannon 650,000 (+) 650,000.00 = 700,000.00
Long Tom Artillery Cannon (Ammo 5) [Empty Bin] 0 (+) 0.00 = 700,000.00
Long Tom Artillery Cannon (Ammo 5) [Empty Bin] 0 (+) 0.00 = 700,000.00
Long Tom Artillery Cannon (Ammo 5) [Empty Bin] 0 (+) 0.00 = 700,000.00
Long Tom Artillery Cannon (Ammo 5) [Empty Bin] 0 (+) 0.00 = 700,000.00
Long Tom Artillery Cannon (Ammo 5) [Empty Bin] 0 (+) 0.00 = 700,000.00
--------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 700,000.00
====================================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------------
Structural Cost 1,011,500.00
Weapons and Equipment Cost (+) 700,000.00 = 1,711,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 2,738,400.00
--------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,738,400.00
|