Cost Breakdown
Name/Model: Heavy AAA
Technology: Inner Sphere
Tonnage: 100
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (286 pts) 16.0 x 20,000 320,000.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 420,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 470,000.00
Engine (Light Fusion) (15,000 x 200 x 100) / 75 (+) 4,000,000.00 = 4,470,000.00
Turret 5 x 5,000 (+) 25,000.00 = 4,495,000.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,495,000.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
LB 5-X AC 250,000 250,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 500,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 750,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 1,000,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 1,250,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 1,500,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,500,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,500,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,500,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,500,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,500,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 1,510,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 1,520,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,520,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 4,495,000.00
Weapons and Equipment Cost (+) 1,520,000.00 = 6,015,000.00
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 12,030,000.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 12,030,000.00
|