Cost Breakdown
Name/Model: Shockwave Slow Ranged Jumper
Technology: Inner Sphere
Tonnage: 50
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Light Ferro-Fibrous): (161 pts) 9.5 x 15,000 142,500.00
Internal Structure (Standard): 50 x 400 x 1 (+) 20,000.00 = 162,500.00
Myomer (Standard): 50 x 2,000 (+) 100,000.00 = 262,500.00
Engine (XL): (20,000 x 200 x 50) / 75 (+) 2,666,666.67 = 2,929,166.67
Gyro (Compact): 3.0 x 400,000 (+) 1,200,000.00 = 4,129,166.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 4,329,166.67
Life Support: 50,000 (+) 50,000.00 = 4,379,166.67
Sensors: 50 x 2,000 (+) 100,000.00 = 4,479,166.67
Heat Sinks (Double): 13 x 6,000 (+) 78,000.00 = 4,557,166.67
Arm Actuators: 50 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 23,000.00 = 4,580,166.67
Leg Actuators: 50 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 35,000.00 = 4,615,166.67
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 4,615,166.67
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
ER Large Laser 200,000 200,000.00
ER PPC 300,000 (+) 300,000.00 = 500,000.00
Jump Jets 50 x (4 x 4) x 200 (+) 160,000.00 = 660,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 810,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 810,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 810,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 810,000.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 4,615,166.67
Weapons and Equipment Cost: (+) 810,000.00 = 5,425,166.67
BattleMech Cost Multiplier: 1 + (50 / 100) (*) 1.50 = 8,137,750.00
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 8,137,750.00
|