Cost Breakdown
Name/Model:         Shamash Reconnaissance Vehicle
Technology:         Clan
Tonnage:            11
Configuration:      Hover Combat Vehicle
======================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------
  Armor (Ferro-Fibrous)              (38 pts) 2.0 x 20,000               40,000.00                    
  Internal Structure (Standard)      1.5 x 10,000            (+)         15,000.00  =        55,000.00
  Control Components                 1 x 10,000              (+)         10,000.00  =        65,000.00
  Lift/Dive Equipment                1.5 x 20,000            (+)         30,000.00  =        95,000.00
  Engine (Fusion)                    (5,000 x 60 x 11) / 75  (+)         44,000.00  =       139,000.00
  Turret                             0.5 x 5,000             (+)          2,500.00  =       141,500.00
------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                       141,500.00
======================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------
  ER Small Laser                     11,250                              11,250.00                    
  ER Small Laser                     11,250                  (+)         11,250.00  =        22,500.00
  ER Small Laser                     11,250                  (+)         11,250.00  =        33,750.00
  ER Small Laser                     11,250                  (+)         11,250.00  =        45,000.00
------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                             45,000.00
======================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------
  Structural Cost                                                       141,500.00                    
  Weapons and Equipment Cost                                 (+)         45,000.00  =       186,500.00
  Combat Vehicle Cost Multiplier     1 + (11 / 50)           (*)              1.22  =       227,530.00
------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                   227,530.00
 
		 |