|                  Cost Breakdown
Name/Model:         Long Tom Carrier II
Technology:         Inner Sphere
Tonnage:            100
Configuration:      Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
  Armor (Heavy Ferro-Fibrous)              (119 pts) 6.0 x 25,000                 150,000.00                    
  Internal Structure (Standard)            10.0 x 10,000               (+)        100,000.00  =       250,000.00
  Control Components                       5 x 10,000                  (+)         50,000.00  =       300,000.00
  Engine (XXL)                             (100,000 x 300 x 100) / 75  (+)     40,000,000.00  =    40,300,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                              40,300,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
  C3 Slave                                 250,000                                250,000.00                    
  Long Tom                                 450,000                     (+)        450,000.00  =       700,000.00
  Long Tom                                 450,000                     (+)        450,000.00  =     1,150,000.00
  Long Tom (Ammo 5) [Cluster] [Empty Bin]  0                           (+)              0.00  =     1,150,000.00
  Long Tom (Ammo 5) [Cluster] [Empty Bin]  0                           (+)              0.00  =     1,150,000.00
  Long Tom (Ammo 5) [Cluster] [Empty Bin]  0                           (+)              0.00  =     1,150,000.00
  Long Tom (Ammo 5) [Cluster] [Empty Bin]  0                           (+)              0.00  =     1,150,000.00
  Long Tom (Ammo 5) [Empty Bin]            0                           (+)              0.00  =     1,150,000.00
  Long Tom (Ammo 5) [Empty Bin]            0                           (+)              0.00  =     1,150,000.00
  Long Tom (Ammo 5) [Empty Bin]            0                           (+)              0.00  =     1,150,000.00
  Long Tom (Ammo 5) [Empty Bin]            0                           (+)              0.00  =     1,150,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                    1,150,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
  Structural Cost                                                              40,300,000.00                    
  Weapons and Equipment Cost                                           (+)      1,150,000.00  =    41,450,000.00
  Combat Vehicle Cost Multiplier           1 + (100 / 100)             (*)                 2  =    82,900,000.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                          82,900,000.00
 |