Cost Breakdown
Name/Model: Enforcer the TSM
Technology: Inner Sphere
Tonnage: 50
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (161 pts) 9.0 x 20,000 180,000.00
Internal Structure (Standard): 50 x 400 x 1 (+) 20,000.00 = 200,000.00
Myomer (Triple-Strength): 50 x 16,000 (+) 800,000.00 = 1,000,000.00
Engine (XL): (20,000 x 300 x 50) / 75 (+) 4,000,000.00 = 5,000,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 5,900,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 6,100,000.00
Life Support: 50,000 (+) 50,000.00 = 6,150,000.00
Sensors: 50 x 2,000 (+) 100,000.00 = 6,250,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 6,310,000.00
Arm Actuators: 50 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 15,000.00 = 6,325,000.00
Leg Actuators: 50 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 35,000.00 = 6,360,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 6,360,000.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
ER Large Laser 200,000 200,000.00
Jump Jets 50 x (6 x 6) x 200 (+) 360,000.00 = 560,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 810,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 810,000.00
Rocket Launcher 10 15,000 (+) 15,000.00 = 825,000.00
Rocket Launcher 10 15,000 (+) 15,000.00 = 840,000.00
Rocket Launcher 10 15,000 (+) 15,000.00 = 855,000.00
Rocket Launcher 10 15,000 (+) 15,000.00 = 870,000.00
Rocket Launcher 10 15,000 (+) 15,000.00 = 885,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 901,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 901,000.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 6,360,000.00
Weapons and Equipment Cost: (+) 901,000.00 = 7,261,000.00
BattleMech Cost Multiplier: 1 + (50 / 100) (*) 1.50 = 10,891,500.00
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 10,891,500.00
|