|                  Cost Breakdown
Name/Model:         Crusher II CRSH-44-SAG
Technology:         Inner Sphere
Tonnage:            60
Configuration:      Tracked Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
  Armor (Standard)                   (168 pts) 10.5 x 10,000             105,000.00                    
  Internal Structure (Standard)      6.0 x 10,000             (+)         60,000.00  =       165,000.00
  Control Components                 3 x 10,000               (+)         30,000.00  =       195,000.00
  Engine (Fusion)                    (5,000 x 240 x 60) / 75  (+)        960,000.00  =     1,155,000.00
  Heat Sinks (Single)                9 x 2,000                (+)         18,000.00  =     1,173,000.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                      1,173,000.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
  Bulldozer                          50,000                               50,000.00                    
  Flamer                             7,500                    (+)          7,500.00  =        57,500.00
  Large Laser                        100,000                  (+)        100,000.00  =       157,500.00
  Large Laser                        100,000                  (+)        100,000.00  =       257,500.00
  Sponson Turrets                    1 x 4,000                (+)          5,000.00  =       262,500.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                             262,500.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
  Structural Cost                                                      1,173,000.00                    
  Weapons and Equipment Cost                                  (+)        262,500.00  =     1,435,500.00
  Combat Vehicle Cost Multiplier     1 + (60 / 100)           (*)               1.6  =     2,296,800.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                  2,296,800.00
 |