Cost Breakdown
Name/Model:         Brutus Assault Tank (PPC)
Technology:         Inner Sphere
Tonnage:            75
Configuration:      Tracked Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
  Armor (Standard)                   (224 pts) 14.0 x 10,000             140,000.00                    
  Internal Structure (Standard)      7.5 x 10,000             (+)         75,000.00  =       215,000.00
  Control Components                 4 x 10,000               (+)         40,000.00  =       255,000.00
  Engine (Fusion)                    (5,000 x 225 x 75) / 75  (+)      1,125,000.00  =     1,380,000.00
  Heat Sinks (Single)                10 x 2,000               (+)         20,000.00  =     1,400,000.00
  Turret                             1.5 x 5,000              (+)          7,500.00  =     1,407,500.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                      1,407,500.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
  PPC                                200,000                             200,000.00                    
  PPC                                200,000                  (+)        200,000.00  =       400,000.00
  SRM 2                              10,000                   (+)         10,000.00  =       410,000.00
  SRM 2 (Ammo 50) [Empty Bin]        0                        (+)              0.00  =       410,000.00
  SRM 6                              80,000                   (+)         80,000.00  =       490,000.00
  SRM 6                              80,000                   (+)         80,000.00  =       570,000.00
  SRM 6 (Ammo 15) [Empty Bin]        0                        (+)              0.00  =       570,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                             570,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
  Structural Cost                                                      1,407,500.00                    
  Weapons and Equipment Cost                                  (+)        570,000.00  =     1,977,500.00
  Combat Vehicle Cost Multiplier     1 + (75 / 100)           (*)              1.75  =     3,460,625.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                  3,460,625.00
 
		 |