|                  Cost Breakdown
Name/Model:         Nuke machine
Technology:         Inner Sphere
Tonnage:            40
Configuration:      Biped IndustrialMech
============================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------------------
  Armor (Heavy Industrial):                               (80 pts) 5.0 x 10,000                                50,000.00                    
  Internal Structure (Industrial):                        40 x 300 x 1                             (+)         12,000.00  =        62,000.00
  Myomer (Standard):                                      40 x 2,000                               (+)         80,000.00  =       142,000.00
  Engine (Fission):                                       (7,500 x 80 x 40) / 75                   (+)        320,000.00  =       462,000.00
  Gyro (Standard):                                        1.0 x 300,000                            (+)        300,000.00  =       762,000.00
  Cockpit (Industrial):                                   100,000                                  (+)        100,000.00  =       862,000.00
  Life Support:                                           50,000                                   (+)         50,000.00  =       912,000.00
  Sensors:                                                40 x 2,000                               (+)         80,000.00  =       992,000.00
  Heat Sinks (Single):                                    5 x 2,000                                (+)         10,000.00  =     1,002,000.00
  Arm Actuators:                                          40 x ((100 x 2) + (50 x 2) + (80 x 2))   (+)         18,400.00  =     1,020,400.00
  Leg Actuators:                                          40 x ((150 x 2) + (80 x 2) + (120 x 2))  (+)         28,000.00  =     1,048,400.00
--------------------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost:                                                                                                          1,048,400.00
============================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------------------
  Arrow IV System                                         450,000                                             450,000.00                    
  Arrow IV System (Ammo 1) [Davy Crockett-M] [Empty Bin]  0                                        (+)              0.00  =       450,000.00
  Arrow IV System (Ammo 1) [Davy Crockett-M] [Empty Bin]  0                                        (+)              0.00  =       450,000.00
  Arrow IV System (Ammo 1) [Davy Crockett-M] [Empty Bin]  0                                        (+)              0.00  =       450,000.00
--------------------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                                                  450,000.00
============================================================================================================================================
IndustrialMech Cost
--------------------------------------------------------------------------------------------------------------------------------------------
  Structural Cost:                                                                                          1,048,400.00                    
  Weapons and Equipment Cost:                                                                      (+)        450,000.00  =     1,498,400.00
  IndustrialMech Cost Multiplier:                         1 + (40 / 400)                           (*)              1.10  =     1,648,240.00
--------------------------------------------------------------------------------------------------------------------------------------------
Final IndustrialMech Cost                                                                                                       1,648,240.00
 |