Cost Breakdown
Name/Model: Highstorm Defender MK 2 HSD-2
Technology: Inner Sphere
Tonnage: 45
Configuration: Tracked Combat Vehicle
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (138 pts) 7.0 x 25,000 175,000.00
Internal Structure (Standard) 4.5 x 10,000 (+) 45,000.00 = 220,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 245,000.00
Engine (XL) (20,000 x 225 x 45) / 75 (+) 2,700,000.00 = 2,945,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,945,000.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
CASE 50,000 (+) 50,000.00 = 800,000.00
PPC 200,000 (+) 200,000.00 = 1,000,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 1,200,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 1,400,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 1,600,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,600,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,600,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,600,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,600,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,600,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,600,000.00
===============================================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost 2,945,000.00
Weapons and Equipment Cost (+) 1,600,000.00 = 4,545,000.00
Combat Vehicle Cost Multiplier 1 + (45 / 100) (*) 1.45 = 6,590,250.00
-------------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,590,250.00
|