|                  Cost Breakdown
Name/Model:         DemolitionMech WI-DMM MOD
Technology:         Inner Sphere
Tonnage:            35
Configuration:      Biped IndustrialMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
  Armor (Industrial):                        (85 pts) 8.0 x 5,000                                 40,000.00                    
  Internal Structure (Industrial):           35 x 300 x 1                             (+)         10,500.00  =        50,500.00
  Myomer (Standard):                         35 x 2,000                               (+)         70,000.00  =       120,500.00
  Engine (Fuel Cell):                        (3,500 x 105 x 35) / 75                  (+)        171,500.00  =       292,000.00
  Gyro (Standard):                           2.0 x 300,000                            (+)        600,000.00  =       892,000.00
  Cockpit (Industrial w/ Adv. FCS):          200,000                                  (+)        200,000.00  =     1,092,000.00
  Life Support:                              50,000                                   (+)         50,000.00  =     1,142,000.00
  Sensors:                                   35 x 2,000                               (+)         70,000.00  =     1,212,000.00
  Heat Sinks (Single):                       4 x 2,000                                (+)          8,000.00  =     1,220,000.00
  Arm Actuators:                             35 x ((100 x 2) + (50 x 2) + (80 x 0))   (+)         10,500.00  =     1,230,500.00
  Leg Actuators:                             35 x ((150 x 2) + (80 x 2) + (120 x 2))  (+)         24,500.00  =     1,255,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost:                                                                                             1,255,000.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
  MagShot Gauss Rifle                        8,500                                                 8,500.00                    
  MagShot Gauss Rifle                        8,500                                    (+)          8,500.00  =        17,000.00
  MagShot Gauss Rifle (Ammo 50) [Empty Bin]  0                                        (+)              0.00  =        17,000.00
  Medium Laser                               40,000                                   (+)         40,000.00  =        57,000.00
  Power Amplifier                            0.5 x 20,000                             (+)         10,000.00  =        67,000.00
  Wrecking Ball                              80,000                                   (+)         80,000.00  =       147,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                                     147,000.00
===============================================================================================================================
IndustrialMech Cost
-------------------------------------------------------------------------------------------------------------------------------
  Structural Cost:                                                                             1,255,000.00                    
  Weapons and Equipment Cost:                                                         (+)        147,000.00  =     1,402,000.00
  IndustrialMech Cost Multiplier:            1 + (35 / 400)                           (*)              1.09  =     1,524,675.00
-------------------------------------------------------------------------------------------------------------------------------
Final IndustrialMech Cost                                                                                          1,524,675.00
 |