Cost Breakdown
Name/Model:         Myrmidon Medium Tank Type 2
Technology:         Inner Sphere
Tonnage:            40
Configuration:      Tracked Combat Vehicle
=========================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------
  Armor (Heavy Ferro-Fibrous)         (148 pts) 7.5 x 25,000               187,500.00                    
  Internal Structure (Standard)       4.0 x 10,000              (+)         40,000.00  =       227,500.00
  Control Components                  2 x 10,000                (+)         20,000.00  =       247,500.00
  Engine (Light Fusion)               (15,000 x 240 x 40) / 75  (+)      1,920,000.00  =     2,167,500.00
  Turret                              1 x 5,000                 (+)          5,000.00  =     2,172,500.00
---------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                        2,172,500.00
=========================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------
  Plasma Rifle                        260,000                              260,000.00                    
  Plasma Rifle (Ammo 10) [Empty Bin]  0                         (+)              0.00  =       260,000.00
  Plasma Rifle (Ammo 10) [Empty Bin]  0                         (+)              0.00  =       260,000.00
  Plasma Rifle (Ammo 10) [Empty Bin]  0                         (+)              0.00  =       260,000.00
---------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                               260,000.00
=========================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------
  Structural Cost                                                        2,172,500.00                    
  Weapons and Equipment Cost                                    (+)        260,000.00  =     2,432,500.00
  Combat Vehicle Cost Multiplier      1 + (40 / 100)            (*)               1.4  =     3,405,500.00
---------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                    3,405,500.00
 
		 |