|                  Cost Breakdown
Name/Model:         Heavy troop transport 120-H
Technology:         Inner Sphere
Tonnage:            100
Configuration:      Tracked Combat Vehicle
==========================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------
  Armor (Standard)                     (390 pts) 24.5 x 10,000              245,000.00                    
  Internal Structure (Standard)        10.0 x 10,000             (+)        100,000.00  =       345,000.00
  Control Components                   5 x 10,000                (+)         50,000.00  =       395,000.00
  Engine (Fusion)                      (5,000 x 300 x 100) / 75  (+)      2,000,000.00  =     2,395,000.00
  Turret                               1 x 5,000                 (+)          5,000.00  =     2,400,000.00
----------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                         2,400,000.00
==========================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------
  Bay, Infantry (Foot) (120 troopers)  20 x 15000                           300,000.00                    
  Light Rifle                          37,750                    (+)         37,750.00  =       337,750.00
  Light Rifle (Ammo 18) [Empty Bin]    0                         (+)              0.00  =       337,750.00
  PPC                                  200,000                   (+)        200,000.00  =       537,750.00
----------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                537,750.00
==========================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------
  Structural Cost                                                         2,400,000.00                    
  Weapons and Equipment Cost                                     (+)        537,750.00  =     2,937,750.00
  Combat Vehicle Cost Multiplier       1 + (100 / 100)           (*)                 2  =     5,875,500.00
----------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                     5,875,500.00
 |