Cost Breakdown
Name/Model:         Galleon Light Tank GAL-100 (SLDF)
Technology:         Inner Sphere
Tonnage:            30
Configuration:      Tracked Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
  Armor (Ferro-Fibrous)              (98 pts) 5.5 x 20,000               110,000.00                    
  Internal Structure (Standard)      3.0 x 10,000             (+)         30,000.00  =       140,000.00
  Control Components                 1.5 x 10,000             (+)         15,000.00  =       155,000.00
  Engine (Fusion)                    (5,000 x 150 x 30) / 75  (+)        300,000.00  =       455,000.00
  Heat Sinks (Single)                4 x 2,000                (+)          8,000.00  =       463,000.00
  Turret                             0.5 x 5,000              (+)          2,500.00  =       465,500.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                        465,500.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
  Large Laser                        100,000                             100,000.00                    
  Medium Laser                       40,000                   (+)         40,000.00  =       140,000.00
  Medium Laser                       40,000                   (+)         40,000.00  =       180,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                             180,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
  Structural Cost                                                        465,500.00                    
  Weapons and Equipment Cost                                  (+)        180,000.00  =       645,500.00
  Combat Vehicle Cost Multiplier     1 + (30 / 100)           (*)               1.3  =       839,150.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                    839,150.00
 
		 |