Cost Breakdown
Name/Model: Gaijin KHF-02
Technology: Inner Sphere
Tonnage: 60
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (200 pts) 12.5 x 10,000 125,000.00
Internal Structure (Endo Steel): 60 x 1,600 x 1 (+) 96,000.00 = 221,000.00
Myomer (Triple-Strength): 60 x 16,000 (+) 960,000.00 = 1,181,000.00
Engine (XL): (20,000 x 300 x 60) / 75 (+) 4,800,000.00 = 5,981,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 6,881,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 7,081,000.00
Life Support: 50,000 (+) 50,000.00 = 7,131,000.00
Sensors: 60 x 2,000 (+) 120,000.00 = 7,251,000.00
Heat Sinks (Double): 13 x 6,000 (+) 78,000.00 = 7,329,000.00
Arm Actuators: 60 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 22,800.00 = 7,351,800.00
Leg Actuators: 60 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 42,000.00 = 7,393,800.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 7,393,800.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
ER PPC 300,000 (+) 300,000.00 = 550,000.00
ER PPC 300,000 (+) 300,000.00 = 850,000.00
ER Small Laser 11,250 (+) 11,250.00 = 861,250.00
Flamer 7,500 (+) 7,500.00 = 868,750.00
Hatchet 4 x 5,000 (+) 20,000.00 = 888,750.00
Jump Jets 60 x (5 x 5) x 200 (+) 300,000.00 = 1,188,750.00
Small Laser 11,250 (+) 11,250.00 = 1,200,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,200,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 7,393,800.00
Weapons and Equipment Cost: (+) 1,200,000.00 = 8,593,800.00
BattleMech Cost Multiplier: 1 + (60 / 100) (*) 1.60 = 13,750,080.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 13,750,080.00
|