|                  Cost Breakdown
Name/Model:         Zorya ammo
Technology:         Clan
Tonnage:            35
Configuration:      Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
  Armor (Standard)                           (56 pts) 3.5 x 10,000                35,000.00                    
  Internal Structure (Standard)              3.5 x 10,000             (+)         35,000.00  =        70,000.00
  Control Components                         2 x 10,000               (+)         20,000.00  =        90,000.00
  Engine (Internal Combustion)               (1,250 x 140 x 35) / 75  (+)         81,666.67  =       171,666.67
  Turret                                     1.5 x 5,000              (+)          7,500.00  =       179,166.67
---------------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                                179,166.67
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
  CASE                                       1 x 50,000                           50,000.00                    
  ECM Suite                                  200,000                  (+)        200,000.00  =       250,000.00
  LB 5-X AC                                  250,000                  (+)        250,000.00  =       500,000.00
  LB 5-X AC (Ammo 20) [Cluster] [Empty Bin]  0                        (+)              0.00  =       500,000.00
  LB 5-X AC (Ammo 20) [Empty Bin]            0                        (+)              0.00  =       500,000.00
  LRM 10                                     100,000                  (+)        100,000.00  =       600,000.00
  LRM 10 (Ammo 12) [Empty Bin]               0                        (+)              0.00  =       600,000.00
  LRM 10 (Ammo 12) [Empty Bin]               0                        (+)              0.00  =       600,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                     600,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
  Structural Cost                                                                179,166.67                    
  Weapons and Equipment Cost                                          (+)        600,000.00  =       779,166.67
  Combat Vehicle Cost Multiplier             1 + (35 / 100)           (*)              1.35  =     1,051,875.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                          1,051,875.00
 |