Cost Breakdown
Name/Model: Boomer CCL
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
=========================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------
Armor (Standard) (264 pts) 16.5 x 10,000 165,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 240,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 280,000.00
Engine (XL) (20,000 x 300 x 75) / 75 (+) 6,000,000.00 = 6,280,000.00
Turret 2 x 5,000 (+) 10,000.00 = 6,290,000.00
---------------------------------------------------------------------------------------------------------
Total Structural Cost 6,290,000.00
=========================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 330,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 410,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 610,000.00
Heavy Rifle 90,000 (+) 90,000.00 = 700,000.00
Heavy Rifle 90,000 (+) 90,000.00 = 790,000.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 790,000.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 790,000.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 790,000.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 790,000.00
Machine Gun 5,000 (+) 5,000.00 = 795,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 795,000.00
Targeting Computer 5 x 10,000 (+) 50,000.00 = 845,000.00
---------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 845,000.00
=========================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------
Structural Cost 6,290,000.00
Weapons and Equipment Cost (+) 845,000.00 = 7,135,000.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 12,486,250.00
---------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 12,486,250.00
|