Cost Breakdown
Name/Model: Bifrost Two-Shot BF0-2SHT
Technology: Inner Sphere
Tonnage: 95
Configuration: Tracked Combat Vehicle
=============================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (286 pts) 16.0 x 20,000 320,000.00
Internal Structure (Standard) 9.5 x 10,000 (+) 95,000.00 = 415,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 465,000.00
Engine (XL) (20,000 x 285 x 95) / 75 (+) 7,220,000.00 = 7,685,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 7,689,000.00
Turret 0.5 x 5,000 (+) 2,500.00 = 7,691,500.00
-------------------------------------------------------------------------------------------------------------
Total Structural Cost 7,691,500.00
=============================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------
ER Large Laser 200,000 200,000.00
Heavy Gauss Rifle 500,000 (+) 500,000.00 = 700,000.00
Heavy Gauss Rifle 500,000 (+) 500,000.00 = 1,200,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
-------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,200,000.00
=============================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------
Structural Cost 7,691,500.00
Weapons and Equipment Cost (+) 1,200,000.00 = 8,891,500.00
Combat Vehicle Cost Multiplier 1 + (95 / 100) (*) 1.95 = 17,338,425.00
-------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 17,338,425.00
|