|                  Cost Breakdown
Name/Model:         ACM Pike Support Vehicle PIK-L7D
Technology:         Inner Sphere
Tonnage:            60
Configuration:      Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
  Armor (Standard)                           (152 pts) 9.5 x 10,000                95,000.00                    
  Internal Structure (Standard)              6.0 x 10,000              (+)         60,000.00  =       155,000.00
  Control Components                         3 x 10,000                (+)         30,000.00  =       185,000.00
  Engine (XL)                                (20,000 x 300 x 60) / 75  (+)      4,800,000.00  =     4,985,000.00
  Turret                                     1 x 5,000                 (+)          5,000.00  =     4,990,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                               4,990,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
  Anti-Missile System                        100,000                              100,000.00                    
  Anti-Missile System (Ammo 12) [Empty Bin]  0                         (+)              0.00  =       100,000.00
  CASE                                       50,000                    (+)         50,000.00  =       150,000.00
  Guardian ECM Suite                         200,000                   (+)        200,000.00  =       350,000.00
  Large Laser                                100,000                   (+)        100,000.00  =       450,000.00
  LRM 5                                      30,000                    (+)         30,000.00  =       480,000.00
  LRM 5                                      30,000                    (+)         30,000.00  =       510,000.00
  LRM 5 (Ammo 24) [Empty Bin]                0                         (+)              0.00  =       510,000.00
  LRM 5 (Ammo 24) [Empty Bin]                0                         (+)              0.00  =       510,000.00
  Small Laser                                11,250                    (+)         11,250.00  =       521,250.00
  Small Laser                                11,250                    (+)         11,250.00  =       532,500.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                      532,500.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
  Structural Cost                                                               4,990,000.00                    
  Weapons and Equipment Cost                                           (+)        532,500.00  =     5,522,500.00
  Combat Vehicle Cost Multiplier             1 + (60 / 100)            (*)               1.6  =     8,836,000.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                           8,836,000.00
 |