Cost Breakdown
Name/Model:         J. Edgar Light Hover Tank (Cell)
Technology:         Inner Sphere
Tonnage:            25
Configuration:      Hover Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
  Armor (Standard)                    (104 pts) 6.5 x 10,000               65,000.00                    
  Internal Structure (Standard)       2.5 x 10,000             (+)         25,000.00  =        90,000.00
  Control Components                  1.5 x 10,000             (+)         15,000.00  =       105,000.00
  Lift/Dive Equipment                 2.5 x 20,000             (+)         50,000.00  =       155,000.00
  Engine (Fuel Cell)                  (3,500 x 145 x 25) / 75  (+)        169,166.67  =       324,166.67
  Heat Sinks (Single)                 1 x 2,000                (+)          2,000.00  =       326,166.67
  Turret                              0.5 x 5,000              (+)          2,500.00  =       328,666.67
--------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                         328,666.67
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
  Light Rifle                         37,750                               37,750.00                    
  Light Rifle (Ammo 18) [Empty Bin]   0                        (+)              0.00  =        37,750.00
  Machine Gun                         5,000                    (+)          5,000.00  =        42,750.00
  Machine Gun                         5,000                    (+)          5,000.00  =        47,750.00
  Machine Gun (Ammo 100) [Empty Bin]  0                        (+)              0.00  =        47,750.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                               47,750.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
  Structural Cost                                                         328,666.67                    
  Weapons and Equipment Cost                                   (+)         47,750.00  =       376,416.67
  Combat Vehicle Cost Multiplier      1 + (25 / 50)            (*)               1.5  =       564,625.00
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                     564,625.00
 
		 |