Cost Breakdown
Name/Model: Gaijin Prime
Technology: Inner Sphere
Tonnage: 25
Configuration: Biped BattleMech
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (89 pts) 5.0 x 20,000 100,000.00
Internal Structure (Standard): 25 x 400 x 1 (+) 10,000.00 = 110,000.00
Myomer (Triple-Strength): 25 x 16,000 (+) 400,000.00 = 510,000.00
Engine (XL): (20,000 x 200 x 25) / 75 (+) 1,333,333.33 = 1,843,333.33
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 2,443,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 2,643,333.33
Life Support: 50,000 (+) 50,000.00 = 2,693,333.33
Sensors: 25 x 2,000 (+) 50,000.00 = 2,743,333.33
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 2,803,333.33
Arm Actuators: 25 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 11,500.00 = 2,814,833.33
Leg Actuators: 25 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 17,500.00 = 2,832,333.33
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 2,832,333.33
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 330,000.00
ER Small Laser 11,250 (+) 11,250.00 = 341,250.00
ER Small Laser 11,250 (+) 11,250.00 = 352,500.00
Jump Jets 25 x (8 x 8) x 200 (+) 320,000.00 = 672,500.00
TAG 50,000 (+) 50,000.00 = 722,500.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 722,500.00
===================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost: 2,832,333.33
Weapons and Equipment Cost: (+) 722,500.00 = 3,554,833.33
BattleMech Cost Multiplier: 1 + (25 / 100) (*) 1.25 = 4,443,541.67
-------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 4,443,542.00
|