Cost Breakdown
Name/Model: Firestorm FSM-1A
Technology: Inner Sphere
Tonnage: 90
Configuration: Tracked Combat Vehicle
=========================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (287 pts) 14.5 x 25,000 362,500.00
Internal Structure (Standard) 9.0 x 10,000 (+) 90,000.00 = 452,500.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 497,500.00
Engine (Light Fusion) (15,000 x 270 x 90) / 75 (+) 4,860,000.00 = 5,357,500.00
Heat Sinks (Single) 20 x 2,000 (+) 40,000.00 = 5,397,500.00
Turret 2 x 5,000 (+) 10,000.00 = 5,407,500.00
---------------------------------------------------------------------------------------------------------
Total Structural Cost 5,407,500.00
=========================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------
Guardian ECM Suite 200,000 200,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 460,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 720,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 980,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 980,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 980,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 980,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 980,000.00
---------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 980,000.00
=========================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------
Structural Cost 5,407,500.00
Weapons and Equipment Cost (+) 980,000.00 = 6,387,500.00
Combat Vehicle Cost Multiplier 1 + (90 / 100) (*) 1.9 = 12,136,250.00
---------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 12,136,250.00
|