Electronic Request System
Current Project:  
Main  |   View Request  |  
 
Request Information
Project: Mordel.Net
Ticket #: 2608-009
Title: Heat sink validation doesn't account for pre-installed heat sinks or non-fusion engines in determining needed count Audit 
System: Unit Management » Combat Vehicles Audit 
Request Type: Defect Audit 
Current Status: Closed - No Action Audit 
Priority: 2: High Audit 
Severity: 2: No Workaround Audit 
Reported By: Kirbanzo  Date Reported: 02-Aug-2026 19:08 Audit 
Assigned To:   Date Assigned:    
Resolved By: Mordel  Date Resolved: 03-Aug-2026 08:28 Audit 
Version Reported: Code Release 2.26.18
Version Resolved:    
Detailed Description: Currently heat sink validation does not take into account any mandated heat sinks that are preinstalled with the engine type. This results in sub-optimal design being forced, with some designs becoming outright un-saveable since adding more than the default heat sinks would bring it over tonnage.

It also does not account for reduced pre-installed sinks for non-fusion engines, expecting at least 10 at all times.
Audit 
Steps to Reproduce: For the main issue:
1. Create new Combat Vehicle with fusion engine
2. Add a weapon that produces waste heat

For the issue with not taking into account reduced pre-installed heat sinks, simply create a new Combat Vehicle with anon-fusion engine. 
Audit 
Resolution:     
What's New (Modules):
What's New (Message):   
Attachments:
 
Go to ticket #