Cost Breakdown
Name/Model: ACM Scorpion light tank SCP-P2
Technology: Inner Sphere
Tonnage: 25
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (120 pts) 7.5 x 10,000 75,000.00
Internal Structure (Standard) 2.5 x 10,000 (+) 25,000.00 = 100,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 115,000.00
Engine (XL) (20,000 x 125 x 25) / 75 (+) 833,333.33 = 948,333.33
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 950,333.33
Turret 1 x 5,000 (+) 5,000.00 = 955,333.33
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 955,333.33
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
Light PPC 150,000 (+) 150,000.00 = 300,000.00
Light PPC 150,000 (+) 150,000.00 = 450,000.00
Small Laser 11,250 (+) 11,250.00 = 461,250.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 461,250.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 955,333.33
Weapons and Equipment Cost (+) 461,250.00 = 1,416,583.33
Combat Vehicle Cost Multiplier 1 + (25 / 100) (*) 1.25 = 1,770,729.17
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,770,729.00
|