Cost Breakdown
Name/Model: Po IIC
Technology: Inner Sphere (Mixed)
Tonnage: 60
Configuration: Tracked Combat Vehicle
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (250 pts) 13.0 x 25,000 325,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 385,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 415,000.00
Engine (Fuel Cell) (3,500 x 240 x 60) / 75 (+) 672,000.00 = 1,087,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,089,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 1,096,500.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,096,500.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
AP Gauss Rifle (C) 10,000 10,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 20,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] (C) 0 (+) 0.00 = 20,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] (C) 0 (+) 0.00 = 20,000.00
CASE 50,000 (+) 50,000.00 = 70,000.00
Hyper-Assault Gauss 20 (C) 400,000 (+) 400,000.00 = 470,000.00
Hyper-Assault Gauss 20 (Ammo 6) [Empty Bin] (C) 0 (+) 0.00 = 470,000.00
Hyper-Assault Gauss 20 (Ammo 6) [Empty Bin] (C) 0 (+) 0.00 = 470,000.00
Hyper-Assault Gauss 20 (Ammo 6) [Empty Bin] (C) 0 (+) 0.00 = 470,000.00
Hyper-Assault Gauss 20 (Ammo 6) [Empty Bin] (C) 0 (+) 0.00 = 470,000.00
Hyper-Assault Gauss 20 (Ammo 6) [Empty Bin] (C) 0 (+) 0.00 = 470,000.00
Hyper-Assault Gauss 20 (Ammo 6) [Empty Bin] (C) 0 (+) 0.00 = 470,000.00
Targeting Computer (C) 3 x 10,000 (+) 30,000.00 = 500,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 500,000.00
=====================================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost 1,096,500.00
Weapons and Equipment Cost (+) 500,000.00 = 1,596,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 2,554,400.00
---------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,554,400.00
|