Cost Breakdown
Name/Model: Volkh VKH-7A
Technology: Inner Sphere (Mixed)
Tonnage: 45
Configuration: Biped BattleMech
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Light Ferro-Fibrous): (144 pts) 8.5 x 15,000 127,500.00
Internal Structure (Standard): 45 x 400 x 1 (+) 18,000.00 = 145,500.00
Myomer (Standard): 45 x 2,000 (+) 90,000.00 = 235,500.00
Engine (XXL): (100,000 x 225 x 45) / 75 (+) 13,500,000.00 = 13,735,500.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 14,635,500.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 14,835,500.00
Life Support: 50,000 (+) 50,000.00 = 14,885,500.00
Sensors: 45 x 2,000 (+) 90,000.00 = 14,975,500.00
Heat Sinks (Double): 14 x 6,000 (+) 84,000.00 = 15,059,500.00
Arm Actuators: 45 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 20,700.00 = 15,080,200.00
Leg Actuators: 45 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 31,500.00 = 15,111,700.00
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 15,111,700.00
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
ER PPC 300,000 300,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 500,000.00
Heavy PPC 250,000 (+) 250,000.00 = 750,000.00
Void-Signature System 2,000,000 (+) 2,000,000.00 = 2,750,000.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,750,000.00
===================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost: 15,111,700.00
Weapons and Equipment Cost: (+) 2,750,000.00 = 17,861,700.00
BattleMech Cost Multiplier: 1 + (45 / 100) (*) 1.45 = 25,899,465.00
-------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 25,899,465.00
|