Cost Breakdown
Name/Model: Thanatos TNS-XOC
Technology: Inner Sphere
Tonnage: 75
Configuration: Biped OmniMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (208 pts) 13.0 x 10,000 130,000.00
Internal Structure (Endo Steel): 75 x 1,600 x 1 (+) 120,000.00 = 250,000.00
Myomer (Standard): 75 x 2,000 (+) 150,000.00 = 400,000.00
Engine (XL): (20,000 x 375 x 75) / 75 (+) 7,500,000.00 = 7,900,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 9,100,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 9,300,000.00
Life Support: 50,000 (+) 50,000.00 = 9,350,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 9,500,000.00
Heat Sinks (Double): 15 x 6,000 (+) 90,000.00 = 9,590,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 1) + (80 x 0)) (+) 18,750.00 = 9,608,750.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 9,661,250.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 9,661,250.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
CASE 50,000 (+) 50,000.00 = 300,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 380,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 460,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 540,000.00
ER PPC 300,000 (+) 300,000.00 = 840,000.00
Jump Jets 75 x (5 x 5) x 200 (+) 375,000.00 = 1,215,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 1,465,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,465,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,465,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,465,000.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 9,661,250.00
Weapons and Equipment Cost: (+) 1,465,000.00 = 11,126,250.00
OmniMech Conversion Cost: (9,661,250.00 + 1,465,000.00) x 0.25 (+) 2,781,562.50 = 13,907,812.50
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 24,338,671.88
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 24,338,672.00
|