Cost Breakdown
Name/Model: Tufana Hovercraft
Technology: Inner Sphere
Tonnage: 35
Configuration: Hover Combat Vehicle
========================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (80 pts) 4.5 x 20,000 90,000.00
Internal Structure (Standard) 3.5 x 10,000 (+) 35,000.00 = 125,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 145,000.00
Lift/Dive Equipment 3.5 x 20,000 (+) 70,000.00 = 215,000.00
Engine (XL) (20,000 x 210 x 35) / 75 (+) 1,960,000.00 = 2,175,000.00
Turret 1 x 5,000 (+) 5,000.00 = 2,180,000.00
------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,180,000.00
========================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------
MML 7 105,000 105,000.00
MML 7 (Ammo 14) [SRM / Narc] [Empty Bin] 0 (+) 0.00 = 105,000.00
MML 7 (Ammo 14) [SRM / Narc] [Empty Bin] 0 (+) 0.00 = 105,000.00
MML 7 (Ammo 17) [LRM / Narc] [Empty Bin] 0 (+) 0.00 = 105,000.00
Narc Missile Beacon 100,000 (+) 100,000.00 = 205,000.00
Narc Missile Beacon (Ammo 6) [Homing] [Empty Bin] 0 (+) 0.00 = 205,000.00
Narc Missile Beacon (Ammo 6) [Homing] [Empty Bin] 0 (+) 0.00 = 205,000.00
TAG 50,000 (+) 50,000.00 = 255,000.00
------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 255,000.00
========================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------------
Structural Cost 2,180,000.00
Weapons and Equipment Cost (+) 255,000.00 = 2,435,000.00
Combat Vehicle Cost Multiplier 1 + (35 / 50) (*) 1.7 = 4,139,500.00
------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 4,139,500.00
|