Cost Breakdown
Name/Model: Mammoth M61A4
Technology: Inner Sphere (Mixed)
Tonnage: 75
Configuration: Tracked Combat Vehicle
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (249 pts) 13.0 x 20,000 260,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 335,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 375,000.00
Engine (XL) (20,000 x 300 x 75) / 75 (+) 6,000,000.00 = 6,375,000.00
Turret 3 x 5,000 (+) 15,000.00 = 6,390,000.00
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost 6,390,000.00
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
AP Gauss Rifle (C) 10,000 10,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 20,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] (C) 0 (+) 0.00 = 20,000.00
CASE (C) 1 x 50,000 (+) 50,000.00 = 70,000.00
Hyper-Assault Gauss 30 (C) 500,000 (+) 500,000.00 = 570,000.00
Hyper-Assault Gauss 30 (C) 500,000 (+) 500,000.00 = 1,070,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] (C) 0 (+) 0.00 = 1,070,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] (C) 0 (+) 0.00 = 1,070,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] (C) 0 (+) 0.00 = 1,070,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] (C) 0 (+) 0.00 = 1,070,000.00
Laser Anti-Missile System (C) 225,000 (+) 225,000.00 = 1,295,000.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,295,000.00
======================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost 6,390,000.00
Weapons and Equipment Cost (+) 1,295,000.00 = 7,685,000.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 13,448,750.00
----------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 13,448,750.00
|