Cost Breakdown
Name/Model: Mammoth M61A5
Technology: Inner Sphere (Mixed)
Tonnage: 75
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (249 pts) 13.0 x 20,000 260,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 335,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 375,000.00
Engine (XXL) (100,000 x 375 x 75) / 75 (+) 37,500,000.00 = 37,875,000.00
Turret 2.5 x 5,000 (+) 12,500.00 = 37,887,500.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 37,887,500.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
AP Gauss Rifle (C) 10,000 10,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 20,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 30,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] (C) 0 (+) 0.00 = 30,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] (C) 0 (+) 0.00 = 30,000.00
CASE (C) 2 x 50,000 (+) 100,000.00 = 130,000.00
Laser Anti-Missile System (C) 225,000 (+) 225,000.00 = 355,000.00
Ultra AC/10 (C) 320,000 (+) 320,000.00 = 675,000.00
Ultra AC/10 (C) 320,000 (+) 320,000.00 = 995,000.00
Ultra AC/10 (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 995,000.00
Ultra AC/10 (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 995,000.00
Ultra AC/10 (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 995,000.00
Ultra AC/10 (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 995,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 995,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 37,887,500.00
Weapons and Equipment Cost (+) 995,000.00 = 38,882,500.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 68,044,375.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 68,044,375.00
|