Cost Breakdown
Name/Model: Pike Support Vehicle (SD) "Safety Dance"
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (158 pts) 8.0 x 25,000 200,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 260,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 290,000.00
Engine (Fusion) (5,000 x 180 x 60) / 75 (+) 720,000.00 = 1,010,000.00
Turret 2 x 5,000 (+) 10,000.00 = 1,020,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,020,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
CASE 50,000 (+) 50,000.00 = 300,000.00
Combat Vehicle Escape Pod 10,000 (+) 10,000.00 = 310,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 460,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 610,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 760,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 760,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 760,000.00
MML 3 45,000 (+) 45,000.00 = 805,000.00
MML 3 45,000 (+) 45,000.00 = 850,000.00
MML 3 (Ammo 33) [SRM] [Empty Bin] 0 (+) 0.00 = 850,000.00
MML 3 (Ammo 40) [LRM] [Empty Bin] 0 (+) 0.00 = 850,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 850,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,020,000.00
Weapons and Equipment Cost (+) 850,000.00 = 1,870,000.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 2,992,000.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,992,000.00
|